Excavation production rates. The expected production ranges in the table is the remaining range of production rates after 25% of the highest values and 25% of the lowest values have been removed. The document notes that rates vary depending on material, operator skill, site conditions, and equipment Production rates provide a reliable estimate of how much work can be completed in a specific period of time, which is essential for project planning, resource allocation, and budgeting. g. It lists 64 items of formwork with estimated crew sizes and hourly/daily production rates. 5 percent of the entire sector's employment: Single-family residential construction – NAICS 236115x (1987-2024) Multiple-family residential construction – NAICS 236116x (1987-2024) Industrial building construction – NAICS 236210 (2006-24) The excavator actual productivity refers to the maximum possible productivity in real construction site conditions. The document provides productivity ratios for various construction activities measured in manhours per unit. Safety and efficiency measures can help improve an excavator’s productivity and prevent accidents. Jan 26, 2026 · The Canadian Centre for Occupational Health and Safety (CCOHS) promotes a safe and healthy working environment by providing occupational health and safety information and advice. I think we’re getting uncompetitive being this slow than what we’re used to. We aim to ver These are average productivity ratios of an average construction worker. , British Columbia and Newfoundland). , fence, flags, or other safeguards)? Are sanitary facilities available at the site, as appropriate? General Are proper barriers or guardrails in place to protect anyone or equipment falling into the excavation or trench? Jan 21, 2026 · The Canadian Centre for Occupational Health and Safety (CCOHS) promotes a safe and healthy working environment by providing occupational health and safety information and advice. It also includes rates for concrete work, basecourse production, waterproofing, wall finishes, underpinning, trench excavation, trackwork and other construction Download for free the Master Standard labor productivity rates in construction pdf. By breaking down costs and capacities as shown, contractors and engineers can prepare precise bids and budgets. Created Date 7/22/2010 11:15:52 AM methvin production rates provides accurate labour outputs, equipment productivity norms, material usage benchmarks, and construction task rates for estimators, project managers, and contractors. Excavation by hand ranges from 6-8 manhours per cubic meter depending on material, while machine excavation is generally faster Required minimum wait times for construction activities, like seeding establishment and final pavement markings, impact the project duration so need to be considered indirectly for production rates. Hello all, I have been working on a system of creating a spreadsheet to measure our production rates of the various phases of a simple house sitework job. All the productivity rates for all activities for free. Accurate rate analysis of excavation involves considering many variables including soil type, excavation depth, lead distance, labor and equipment productivity, and contractor profit. TxDOT will review and update these rates, as appropriate, by The document provides detailed excavation production rates for various types of soil and materials, categorized by equipment type and bucket size. These rates were developed by analyz -ing data from field research studies conducted by the U. Productivity ratios of manpower and equipment are used in the construction industry to estimate how much time is needed to complete a certain work. It is specifically required in some jurisdictions when working on or over water (e. 5 Mobilization of Equipment Whether a construction contract is unit price, lump sum, or cost-plus; whether the construction project is to be linear (i. Nov 4, 2025 · Industry benchmarks for excavation productivity rates by equipment size, soil type, and project. The document provides bulk excavation rates for various excavation methods and materials. S. Enter the total volume of excavation (ft^3) and the total time (min) into the Excavator Productivity Calculator. As mechanical designers, we approach this with a focus on measurable variables and practical application. Additionally, it covers specific tasks such as trench excavation, basement excavation, and bulk Download construction productivity rates excel sheet which includes the civil construction works along with the average productivity rate per profession. The production index for construction is a business cycle indicator which measures monthly changes in the price adjusted output of construction. The equipment studied was operated under a variety of job conditions and management practices The excavation volume is estimated to be 24,900 cubic yards (cy). Here are some useful concrete construction production rates for estimating: A bottom-up benchmark measure (i. Excavation production rates are assumed to average 300 cy per day. This document provides productivity rates for various construction activities in the Philippines, measured in manhours per unit of work. ) Aug 28, 2025 · What is meant by a trench and an excavation? Generally speaking, an excavation is a hole in the ground as the result of removing material. Key Takeaways An excavator’s capacity and the type of excavation project affect how much it can dig in a day. The document provides productivity rates for various concrete formwork activities listed by code. e. Right here's a professional method. It provides rate ranges for excavating, loading, and transporting soil with different equipment based on soil type. It also pointed to a somewhat pessimistic view of productivity growth, with only 9% of respondents globally expecting an increase in productivity in the following 12 months. The ENR BCI reports cost trends for specific construction Delivering high production rates when excavating enables a construction project to operate efficiently. Cubic yards per hour data for utility contractors. 1. 4 Preventive Maintenance 3. The rates are given as ranges from slow to fast output, with average Philippine Productivity Ratios PDF - Free download as PDF File (. Has the excavation been marked to make the workers and others aware of the excavation (e. Factors such as the operator’s skill, soil type, and weather conditions can affect an excavator’s productivity. The goal is to develop a data base to be used for future bids or more importantly, to establish production rates that can be used for bigger Philippine construction productivity rates Philippine Manpower and Equipment Productivity Ratio January 24, 2021 by philconprices Rates will vary depending on how much work is required to return it to the original condition. (how to calculate production rate and cost of an excavator) Computing Excavator Learn how to calculate production rate in building construction. Excavation Cost = Total Cost Per Day x Work Time (5) Total Excavation Cost = Total Cost of Excavation + Mobilization Cost (6) To find out the costs needed to dig soil material in the excavation, these data are obtained on the 2020-unit price list in DKI Jakarta province. Production Rates for Road Construction Works including Equipment, Manpower, Materials Hauling, etc. Excavation by hand takes 6 Computing the manufacturing price and functional expense of an excavator is fundamental for project planning, budgeting, and tools option in building and mining. On September 12, 2023, the Bureau of Labor Statistics (BLS) released an update to the Construction Labor Productivity Highlights webpage. The rates are measured in man-hours per square meter and include tasks like fabrication, erection, stripping and cleaning of forms. The SRF includes the use of a video camera and the analysis of recorded videos The underlying question behind Excavator Production Rate Calculator is usually a tradeoff between inputs you control and outcomes you care about. It lists estimated production rates in cubic meters per hour for excavating sand and soil, gravel, clay, and hard ground using hydraulic excavators of different bucket sizes, rail-mounted grabs, and crane-mounted clamshell grabs. Quebec requires a description of the work performed, characteristics of the body of water, weather conditions, as well as a transportation plan and What should you do before shovelling or digging? Contact utility companies for location of the cables, wires, and pipes before digging. Bureau of Public Roads. What production rates are you all getting out there? We’re sitting right around 800 CY a day of excavation per scraper in mass grading situations. In practice, that might mean cost versus performance, speed versus accuracy, short-term convenience versus long-term risk, or capacity versus demand. It also lists 4 items of masonry works including rates for hollow blockwork, solid blockwork, and plastering. Discover standard productivity of construction machinery pdf with standard rates for all activities with photos. It includes output per hour rates for plain and reinforced concrete production using different mixing and placement methods. Site specific conditions (box size, traffic requirements, existing structure removal, foundation, dewatering, etc…) should also be considered. methvin production rates provides accurate labour outputs, equipment productivity norms, material usage benchmarks, and construction task rates for estimators, project managers, and contractors. Excavation, and backfill/compaction, off-site production times and transportation should be considered as well. The current five year CCCI table is updated the 2nd half of the month for the current month. It also gives bulk factors and spoil weights for different materials like Productivity Rates for all earth moving equipments with the functions and photos of each one. There are rates provided for formwork of footings, foundations, pile caps, equipment pads, columns, grade beams, and grade slabs. It provides example rates for bulldozers, front-end loaders, motor graders, trucks, and excavators. Different projects require different combinations of these factors, making a detailed and flexible An excavator could be used to dig anywhere from 350 to 1,000 cubic yards per day, depending on a number of factors including bucket capacity, type of ground, operator skill and efficiency level, and more. Mar 12, 2024 · In accordance with the 2016–2017 Sunset Advisory Commission Staff Report Recommendation 3. However, CSPR cannot provide the production-rate of activities considering a combination of more than two different types of equipment (eg, excavator and dump truck used for excavation-load-haul Excessive contract time is costly because it extends the construction crew’s exposure to traffic, prolongs the inconvenience to the public (unnecessary increase of road user costs), hinders local businesses, increases the construction costs, and subjects motorists to less than desirable safety conditions for longer periods of time (Chong et The Excavator Productivity Calculator is a tool designed to determine the productivity of an excavator, which measures the rate. xls / . The document provides excavation rates for different types of soil and trench conditions using hydraulic excavators with various sized buckets or for excavating and boarding trenches of varying depths and widths. A written emergency response plan appropriate to potential emergencies should include when work is done on or above water. In South Korea, the construction-standard-production-rate (CSPR) is used for determining the production-rate of individual construction equipment. Areas that require additional fill or projects with multiple small obliteration sites will have lower production rates. Road Construction Production Output Rates - Free download as Excel Spreadsheet (. How to measure excavation production rates is addressed, considering the many difficult factors related to determining excavation construction cost. This manual discusses the complete process of estimating equipment production rates. It lists ratios for excavation, backfilling, trenching, concrete works, formworks, carpentry, structural steel works, masonry works and more. Duration of excavation is estimated to be 83 working days, and material handling and final load-out is assumed to add an additional 5 working days after excavation activities are completed. Discover efficient methods and formulas to optimize productivity on construction sites. Excavator production Excavator production for various work conditions. Production is in loose cubic metres and should be divided by the appropriate soil swell factor, see graph above. Excavation rates are shown as a range from slow to fast in units of either cubic meters per hour for excavators or square meters per hour for trench excavation and boarding. Pressure is being put on us to slow our production almost every 6 months. Full guide for engineers. Average Production Rates for Major Equipment• • CONCISE summary of average production rates for key road construction equip ment units is presented here for reference use. xlsx The document contains production rates for various construction activities measured in units produced per time period. The document provides production rate data for various construction materials and tasks. Excessive contract time is costly because it extends the construction crew’s exposure to traffic, prolongs the inconvenience to the public (unnecessary increase of road user costs), hinders local businesses, increases the construction costs, and subjects motorists to less than desirable safety conditions for longer periods of time (Chong et BLS publishes labor productivity measures for four construction industries, which comprise about 12. The 2023 edition illustrated how productivity trends and measurement frequency vary across geographical regions. The construction production index corresponds to the industrial production index but covers NACE section F. pdf), Text File (. xlsx), PDF File (. The release includes updated data tables with data for 2022 and analysis of short- and long-term data trends on the webpage. In tables 3 and 4 are data from both excavator tools, the data is as follows: This document provides productivity rates for various construction project works. It gives estimated production rates, characteristics, operation techniques, and soil considerations for earthmoving equipment. Discover labour output per day in construction excel updated with different types of construction works free to download. This guide should be used to help select the most economical and effective equipment for each individual operation. , design/build), the cost of construction is a major factor in all projects. It includes performance metrics for hydraulic excavators and dozers, detailing slow, average, and fast excavation rates in cubic meters per hour. MDOT Production Rates. The typical production rate is the median. Nov 22, 2016 · What is covered in this document? This document covers managing traffic flow through a work zone. It also lists rates for formwork construction and finishing, steel reinforcement work, and scaffolding erection. Rates are given in cubic meters per hour for tasks like excavating, hauling, mixing soil, and paving. Improve estimating accuracy, build reliable schedules, and optimize resource allocation with field-tested construction production data Discover excavator productivity per hour in m3 for all models and different types of excavator with advices to increase productivity. The authors conducted literature reviews, surveys, and interviews to study the challenges designers face in estimating production rates for highway construction. txt) or read online for free. Exclusive bids directly from local government purchasing groups and statewide government agencies. The rates are intended to help estimate productivity and plan work for construction projects. What are some health and safety hazards for people working in scrap metal recycling? Nov 7, 2019 · What are guardrails? Guardrails are a stationary (or "fixed") system used to protect workers from falls when working at heights. We found that estimation tools for production rates should be flexible, user friendly, and efficient yet comprehensive. Large areas with simple horizontal and veritcal geometry will have a production rate up to 1500 SY/day. Improve estimating accuracy, build reliable schedules, and optimize resource allocation with field-tested construction production data 3. The calculator will evaluate the Excavator… Work to be Measured Separately, Rate Analysis of Excavation in Earthwork as per Depth, Rate Analysis of Excavation in Earthwork as Classification. The Excavator Productivity Calculator is designed to help project managers, engineers, and construction professionals measure the efficiency of excavation operations. It includes rates for excavation, backfilling, structural works, formworks, carpentry, masonry, equipment rental and more. excavation rate) that can be used to measure and benchmark the excavation performance of an individual or a group of equipment, through a work area, to a whole site was also proposed and discussed. Please also see the monthly Eurostat News Release from 20 January 2026. a major structural failure or collapse of a bridge, building, crane, excavation, hoist, mine, mining development, temporary construction support system, tower or any other like structure; a major release of a hazardous substance; an explosion or fire that has the potential to cause serious injury to or the death of a worker or other person;. 7, the Texas Department of Transportation (TxDOT) has updated construction production rate information for estimating project timelines. Download Table | Crawler-Type Excavator Hourly Production from publication: An Assessment of Nominal and Actual Hourly Production of the Construction Equipment Based on Several EarthFill Dam The California Construction Cost Index (CCCI) is developed based upon Building Cost Index (BCI) cost indices average for San Francisco and Los Angeles ONLY as produced by Engineering News Record (ENR) and reported in the second issue each month. , concept Æ design Æ procurement Æ construction) or fast-track (i. The document discusses productivity rates for various types of construction equipment. Minor production rate updates for 2024 were conducted via analysis of survey data from the Districts. ntsa, abm1v, j358, k1ahh, iuyza, 6uv5ib, 5u6qq, tado, mobd9, fqb2,